Quality Assurance Department
GSI Metal Industry Limited has certifications and approvals of the international standard institutes. The ownership of these certifications and approvals is conditioned upon frequent supervision and monitoring measures taken by both institutes.
As such, the GSI team is committed to absolute quality and proudly bears this concept as a synonymous. This has been the foundation upon which GSI built its reputation which has consequently led to its leading position.
We understand that steel manufacturing has more to it than commonly thought. It is an extremely complicated business and therefore we have set a system of quality assurance and control procedures according to ISO9000 compatible with those of national and international standards.
These procedures are being strictly applied at GSI from the first day of a project’s life, starting with the detailed engineering and design through the unconditional selective process of the purchased material, then the actual manufacturing up to the handing over of the project to our clients. This is an irrevocable process applied by our staff, suppliers and subcontractors to ensure the over-all integrity of the work, and guarantee our clients full satisfaction. As we are convinced in our process, we always provide our clients guarantees and warrantees for our products’ reliability.
Our quality control procedures are acceptable by the chemical, electric, petroleum, marine, military and additional enterprises.
Another procedural quality control measure that we undertake is the objective NDT – None Destructive Tests, which are conducted by third party laboratories. The laboratories’ professionalism is approved, and they hold a certificate of ANSI level III for approving and monitoring the NDT’s quality. Those tests, protocols and reports will be presented to our clients at every stage of the project.
Final documentation and quality control documents constitute the following:
- QIP Quality Inspection Plan signed and approved.
- Materials’ certificates.
- Welders list & WPS {welding procedures specification).
- Dimensional Measurement protocols.
- Corrosion protection reports.
- Marking & Packing & Shipment to site of elements.
- NDT laboratory results, tractability records, Welds plan, etc.
- Customer’s Test and inspection reports, where valid.